Geographische Lage / geographical location: Hier klicken / click here

2023

– Supervision of the water filtration plant in Naiti

2022

– Construction of two water points with connection to the water tanks
– Intensive training of the water committee of Naiti
– Handover of the ready-to-use facility to the village of Naiti on May 28, 2022

2021

– Construction of a small house with a brick water tank to house the filtration membranes
– Installation of solar panels on the roof of the house
– Installation of a battery system
– Installation of water pump in the lake and pipe connection to the water tank
– Installation of external water tanks to hold the filtered water

Drinking water for Naiti
Date

1. January 2023

Client

ECLAT

Category

Water Projects