2023

– Construction of a dormitory for girls
– Purchase of beds and mattresses
– Handover to the government as operator of the school on September 29, 2023

2021

– Construction of a dormitory for girls
– Purchase of beds and mattresses
– Installation of six more water tanks on the school grounds
– Construction of a building with washing and shower cabins
– Construction of a toilet block
– Construction of four classrooms
– Purchase of school benches
– Fencing of the school grounds, among other things, to protect against wild animals
– Handover to the government as operator of the school on December 3, 2021

2020

– Construction of two dormitories for boys
– Purchase of beds and mattresses
– Construction of wash and toilet houses for boys and girls
– Construction of four residential houses (row houses) for teachers
– Construction of two first-aid rooms for boys and girls
– Construction of two water towers with water tanks for washrooms
– Repair of the solar system (inverter)
– Handover to the government as operator of the school on December 3, 2021

2019

– Construction of a double dormitory for the “house father” of the students and the “house mother” of the girls
– Construction of a dormitory for girls
– Purchase of beds and mattresses
– Construction of three classrooms
– Purchase of school desks
– Teaching materials and equipment for the laboratories
– Construction of pedestals for water tanks at the washrooms and toilets
– Construction of an incinerator for the girls’ toilets
– Handover to the government as operator of the school on October 19, 2019

2018

– Connection of the buildings to the solar power supply system
– Construction of a dormitory for girls
– Purchase of beds and mattresses
– Handover to the government as operator of the school on May 12, 2018
– Construction of a computer center and equipment with 21 modern computers
– Construction of a library with bookshelves, tables and chairs for studying
– Handover to the government as operator of the school on October 20, 2018

2017

– Construction of the science rooms for biology, chemistry and physics
– Handover to the government as operator of the school on September 29, 2017
– Construction of six terraced houses as residential buildings for teachers
– Handover to the government as operator of the school on February 19, 2018

2016

– Construction of a multipurpose hall with kitchen
– Delivery of 650 modern, simple chairs and 100 tables
– Delivery and installation of a modern audio/video system in the multipurpose hall
– Construction of a steel framework with four water tanks for storage
– Laying of the main supply lines for water in the school premises
– Construction of toilet and washing facilities with connection to the water network
– Construction of three biogas digesters at the toilets
– Connection of the kitchen to the water network and the biogas from the digesters at the toilets
– Construction of a solar plant with batteries for the power supply of the school
– Handover to the government as operator of the school on October 20, 2016

2015

– Construction of two dormitories for boys
– Purchase of beds and mattresses
– Construction of a double dormitory for teachers and their families
– Handover to the government as operator of the school on November 13, 2015

2014

– Borehole, water tank and solar groundwater pump.
– Handover to the government as operator of the school on October 16, 2014

Emboreet: Construction and extension of the Secondary School
Date

29. September 2023

Client

ECLAT

Category

Secondary Schools